The General Tab

The General tab contains the following information:

  • Resource Availability Table. If the maximum units for the resource will be unchanging for the life of the project, you don't have to make any entries in this table. However, if the maximum units will change during the life of the project, enter each time period with a different value for maximum units on a separate row of the table in chronological order. Enter the beginning date for each period in the Available From field, the ending date in the Available To field, and the maximum units in the Units field.